Kyiv, pr-t Heroiv Stalinhrada 10-A, korp. 9

Construction of the Dniester PSH

Europe’s largest hydroelectric power station (design capacity 2268 MW)

Subcontracting:

Range of earthwork activities for the arrangement of the upper water reservoir with total volume of 38.8 million m3.
Construction of administrative, household and technical premises