Kyiv, pr-t Heroiv Stalinhrada 10-A, korp. 9

Overhaul of the park along the General Shukhevich Avenue

As part of the overhaul, in accordance with the contract, our company has completed clearing of the local pond, reinforcing shoreline with the gabions, vertical planning of the soil, laid networks, equipped footpaths (1450 square meters with paving slabs and 5030 square meters of presscrete), installed two children playgrounds, sport area, gazebo and a bridge, public lavatory and airbrushing technical room, automatic irrigation system, video surveillance system, outdoor lighting, arranged lawns, small architectural forms and park navigation system.